GENERAL SPECIFICATIONS
|
1.
Description: |
The patching material shall be composed of a suitable aggregate, plant-mixed
with WESPRO Special Liquid Blend, from WESPRO Asphalt
Products, Inc. The bituminous material shall be capable of coating approved
aggregates without stripping, and shall be available in various grades
to meet existing conditions. The material will be packaged in plastic
bags, plastic five gallon pails, or in bulk. The patching product shall
be capable of maintaining adhesive qualities in patched areas which
are damp or wet at the time of application.
|
2.
Materials:
|
Aggregate will consist
of Limestone or approved equal, and comply with Gradation of Extracted
Aggregate Results according to ASTM C136. Typically as follows:
|
Percent
by Dry Weight Passing
|
Sieve Size |
%
Passing |
3/8" |
95.0% |
#4 |
44.0% |
#8 |
16.0% |
#16 |
9.0% |
#30 |
5.0% |
#50 |
3.0% |
#100 |
2.0% |
#200 |
.7% |
Soundness
Loss (Sodium-5Cycles) |
12.0%
Maximum |
Los
Angeles Abrasion Loss: |
40.0%
Maximum |
200
Sieve (By Wash) |
2.0%
Maximum |
Absorption |
1.0%
- 2.5% |
Specific
Gravity |
2.5% - 2.8% |
Other
Deleterious Matter |
3.0%
Maximum |
|
Bituminous Material
shall be WESPRO Special Liquid Blend, from Wespro Asphalt Products,
Inc. It shall meet the requirements of ASTM D2026 modified as follows:
|
Flash
Point (TOC) |
200
F Maximum |
Water |
.20
Maximum |
Distillation
Test: |
|
to 437 F |
0 |
to 500 F |
0 |
to 600 F |
0 |
Residue
from Distillation, |
|
Volume
% by difference |
99.5 |
|
In distillation
of recovered asphalt, there shall be no distillate up to 600 F and only
0.5% distillate to 680 F.
|
3.
Composition of Mixture:
|
The mixture shall
consist of an aggregate conforming to Section 2(a), and a bituminous
material conforming to Section 2(b) mixed in such a manner as to contain
approximately 120 lbs. of bituminous material per finished ton (6.0%).
|
Minimum |
Maximum |
5.5%
|
6.5% |
(110
lbs. /ton) |
(130
lbs./ton) |
|
4.
Stripping Test:
|
Immediately after mixing, the mixture shall meet the requirements of
ASTM 1664, whereby not more than 5% of the aggregate particles shall
remain uncoated.
|
5.
Storing or Stockpiling:
|
Immediately following the production of the WESPRO product the material
should be allowed to cool down to ambient temperature before loading
out or placement in repair areas. The stockpile can be however large
you decide is best for space requirement. Also, in case of inclement
weather, such as rain, during the period while material is still above
ambient temperature it would be best to cover material to ensure stripping
does not take place.
It is normal for
a crust to form on the exterior of the stockpile due to the product
characteristics, but the interior will remain pliable and ready to use
along with the crust when blade mixed together.
|
6.
Handling Precautions:
|
In handling of WESPRO Asphalt Patching Material normal industry-wide
safety precautions such as the prevention of cigarette smoking, and
any other form of ignition or combustion, should be strictly adhered
to
|
|